Overhead cranes—often called bridge cranes—are the quiet workhorses that keep heavy industry moving. This long-form walkthrough follows the journey from bare runways to a commissioned crane ready for service. You’ll see rails and runway alignment—with the same checklists pro installers use.

Bridge Crane Basics

At heart, a bridge crane is a bridge beam that spans between two runway beams, with a trolley that travels left-right along the bridge and a hoist that lifts the load. The result is smooth X-Y-Z motion: and lift via the hoist.

They’re the backbone of heavy shops and assembly lines, from beam handling to turbine assembly.

Why they matter:

Controlled moves for large, expensive equipment.

Less manual handling, fewer delays.

Lower risk during rigging, lifting, and transport inside facilities.

High throughput with fewer ground obstructions.

Scope at a Glance

Runways & rails: continuous beams and rail caps.

End trucks: motorized gearboxes for long-travel.

Bridge girder(s): single- or double-girder configuration.

Trolley & hoist: cross-travel carriage with lifting unit.

Electrics & controls: power supply, festoon or conductor bars.

Stops, bumpers & safety: overload protection, e-stops.

Based on design loads and bay geometry, you may be dealing with modest shop lifts or major industrial picks. The installation flow stays similar, with heavier rigs demanding extra controls and sign-offs.

Make-Ready & Surveys

Good installs start on paper. Key steps:

Drawings & submittals: Approve general arrangement (GA), electrical schematics, and loads to the structure.

Permits/JSAs: Job Safety Analysis (JSA) for each lift step.

Runway verification: Survey columns and runway beams for straightness, elevation, and span.

Power readiness: Confirm conductor bars or festoon supports, cable trays, and isolation points.

Staging & laydown: Lay out slings, shackles, spreader bars, and chokers per rigging plan.

People & roles: Brief everyone on radio calls and stop-work authority.

Tiny survey errors balloon into hours of rework. Measure twice, lift once.

Rails & Runways

Runway alignment is the foundation. Targets and checks:

Straightness & elevation: shim packs under clips to meet tolerance.

Gauge (span) & squareness: Check centerlines at intervals; confirm end squareness and expansion joints.

End stops & buffers: Verify clearances for bumpers at both ends.

Conductor system: Mount conductor bars or festoon track parallel to the rail.

Log final numbers on the ITP sheet. Misalignment shows up as crab angle and hot gearboxes—don’t accept it.

Lifting the Bridge

Rigging plan: Softeners protect painted flanges. Dedicated signaler on radio.

Sequence:

Lift end trucks to runway level and set temporarily on blocks.

For double-girder cranes, lift both girders with a matched raise.

Land the bridge on the end trucks and pin/bolt per GA.

Verify camber and bridge square.

Prior to trolley install, bump-test long-travel motors with temporary power (under permit): ensure correct rotation and brake release. Lock out after test.

Cross-Travel Setup

Trolley installation: Hoist/trolley arrives pre-assembled or as modules.

Hoist reeving: Check rope path, sheave guards, and equalizer sheaves.

Limits & load devices: Set upper/lower limit switches.

Cross-travel adjustment: Verify end stops and bumpers.

Pendant/remote: Install pendant festoon or pair radio receiver; function-test deadman and two-step speed controls.

A smooth trolley with a quiet hoist is a sign of good alignment. Don’t mask issues with higher VFD ramps.

Drive Tuning & Interlocks

Power supply: Drop leads tagged and strain-relieved.

Drive setup: Enable S-curve profiles for precise positioning.

Interlocks & safety: E-stops, limit switches, anti-collision (if multiple cranes), horn, beacon.

Cable management: Keep loops short, add drip loops where needed.

Future you will too. Photos of terminations help later troubleshooting.

QA/QC & Documentation

Inspection Test Plan (ITP): Third-party witness for critical steps.

Torque logs: Record wrench serials and values.

Level & gauge reports: Attach survey prints.

Motor rotation & phasing: Document bump tests.

Functional tests: Jog commands, inching speeds, limits, overloads, pendant/remote range.

A tidy databook speeds client acceptance.

Ready for Work

Static load test: Hold at mid-span and near end stops; monitor deflection and brake performance.

Dynamic load test: Travel long-run, cross-travel, and hoist at rated speed with test load.

Operational checks: Limit switches trigger reliably; overload trips; horn/beacon function.

Training & handover: Maintenance intervals for rope, brakes, and gearboxes.

Only after these pass do you hand over the keys.

Where These Cranes Shine

Construction & steel erection: handling long members safely.

Oil & gas & power: generator and turbine assembly.

Steel mills & foundries: hot metal handling (with the right duty class).

Warehousing & logistics: high throughput lanes.

Once teams learn the motions, cycle times drop and safety improves.

Safety & Engineering Considerations

Rigging discipline: dedicated signaler and stop-work authority.

Lockout/Tagout: test before touch every time.

Fall protection & edges: scissor lifts and manlifts inspected.

Runway integrity: regular runway inspection plan.

Duty class selection: overspec when uncertainty exists.

Safety isn’t a stage—it's the whole show.

Keep It Rolling

Crab angle/drift: verify end-truck wheel diameters and gearbox mounts.

Hot gearboxes: adjust brake air gap and reduce VFD decel.

Rope drum spooling: dress rope and reset lower limit.

Pendant lag or dropout: antenna placement for radio; inspect festoon collectors.

Wheel wear & rail pitting: add rail sweeps and check clip torque.

Little noises are messages—listen early.

FAQ Snippets

Overhead vs. gantry? Choose per site constraints.

Single vs. double girder? Singles are lighter and cheaper; doubles carry heavier loads and give more hook height.

How long does install take? Anything from a couple weeks to a few months.

What’s the duty class? FEM/ISO or CMAA classes define cycles and service—don’t guess; size it right.

Who Gets the Most Value

Students and pros alike get a front-row seat to precision rigging, structural alignment, and commissioning. You’ll see how small alignment wins become big reliability wins.

Need a field bundle with JSA templates, rigging calculators, and commissioning sheets?

Grab the installer pack and construction chemicals cut hours from setup while boosting safety and QA/QC. Save it to your site tablet for quick reference.

...